Propane Tee Fitting

Propane Tee Fitting

The Propane Y Splitter Tee Fitting includes 1 -QCC1(ACME)and 2-male QCC can connect 2 propane appliances to one 5-20lb propane tank1 propane tank.
Send Inquiry
Description
Technical Parameters

Description

This Propane Tee Fitting consists of one QCC1 (ACME) and two QCC components, which can connect two propane units to one 5-20lb propane tank and one propane tank. It is specially designed for low-pressure natural gas or propane system. It is made of high-quality rubber and durable brass materials, with the characteristics of durability, and it will not easily deform or rust during long use. In addition, it is also equipped with thread sealing tape to provide safe connection and leak free operation, so that you can use it more safely.



Features

Our Propane Tee Fitting has a wide range of applications, can not only separate your low-pressure natural gas or propane system, but also be connected to two hoses at the same time, being often used in RV barbecue racks, stoves, gas stoves and other applications. At the same time, it is equipped with a safety device, which can make the gas flow uniformly and prevent leakage when the hose is disconnected. When the pressure reaches, it will automatically cut off the gas flow, ensuring the safety of gas separation.



  • Model:ZJ002-1 (Propane Y Splitter Tee Fitting)

  • Inlet :QCC1 (ACME)

  • Outlet :QCC1(male)*2

Propane Tee Fitting - .jpg

FAQ

Q: Do you have products in stock?

A: No, all the products are produced according to different countries standard and customers requirements.


Q: What’s the delivery time?

A: Usually it takes 15-25 working days after customer confirms the order from MOQ to 40HQ container. But the exact delivery time might be different for different orders (some with special requirements) and different time (busy season and slack season) .


Q: Do you have certificate?

A: Yes, we have ISO,CSA, CE,AGA cert.


Q: How does your factory do regarding the quality control?

A: Quality is priority. Our factory has passed ISO 9001 with annual audit. Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc. Besides, we have also developed a procedure which identifies the inspection and test status of all items at all stages of the manufacturing process.100% inspection in assembly lines. All controls, inspections, equipment, fixtures, total production resources and skills are inspected to ensure they consistently achieve the required quality levels .


Send Message